Load-Oriented Manufacturing Control

3,921.51 THB
ราคาสมาชิก
3,529.36
English

Product Description

§16§Load-Oriented Manufacturing Control is unique as it gives comprehensive and self-contained principles for the implementation of an appropriate production control technique of general applicability. It is based on the "funnel model", a new approach to scheduling and scheduling control which has an extensive monitoring and diagnosis system. Its most important system components include throughput diagrams, load-oriented order release, schedule-oriented capacity planning and control. The "funnel model" is getting increasing implementation in manufacturing companies. It is available in numerous variants and is especially significant for the job-shop and series production. Load-Oriented Manufacturing Control provides a large number of practical examples and is therefore relatively easy to understand. It offers direct implementation of this new important technique in manufacturing scheduling and control. §04§1 Introduction.- 1.1 Preface.- 1.2 Changes in the Manufacturing Environment.- 1.3 Shifting Objectives of Manufacturing Control.- 1.4 Scheduling in Practice.- 1.5 The Weak Points of Conventional Manufacturing Control.- 1.6 References.- 2 Conventional Production Scheduling and Control.- 2.1 Abstract.- 2.2 Survey.- 2.3 Lead Time Scheduling and Capacity Scheduling.- 2.4 Evaluation of Conventional Lead Time Scheduling.- 2.5 Requirements for New Methods of Production Scheduling and Control.- 2.6 References.- 3 Lead Time - A Key Term in Manufacturing Control.- 3.1 Abstract.- 3.2 Introduction.- 3.3 Lead Time Components.- 3.4 Simple and Weighted Mean Lead Time at a Work Center.- 3.5 Order Lead Times.- 3.6 Statistical Evaluation of Work Center Lead Times.- 3.7 Work Center Lead Time in the Shop Calendar.- 3.8 Uncertainty of Measurement and Accuracy of Computed Lead Time Values.- 3.9 Examples of Authentic Lead Time Measurements.- 3.10 References.- 4 The Throughput Diagram - A General, Realist §04§ic Model of the Manufacturing Process.- 4.1 Abstract.- 4.2 Historical Evolution.- 4.3 Basic Form of the Throughput Diagram.- 4.4 The Work Center Throughput Diagram and its Basic Data.- 4.5 Order Throughput Diagram.- 4.6 References.- 5 Analysis, Monitoring, and Diagnosis of the Manufacturing Flow.- 5.1 Abstract.- 5.2 Manufacturing Flow Monitoring.- 5.3 Manufacturing Flow Analysis.- 5.4 A Continuous Monitoring System for Manufacturing Flow.- 5.5 Diagnosis of the Manufacturing Flow in the Throughput Diagram.- 5.6 Use of Graphics for the Representation of Throughput Diagrams and Key Data.- 5.7 Implications for Manufacturing Control.- 5.8 References.- 6 Load-Oriented Order Release.- 6.1 Abstract.- 6.2 Fundamental Relationships.- 6.3 Procedure.- 6.4 Conversion of the Orders to be Loaded.- 6.5Sample Demonstration of the Release Process.- 6.6 How to Choose the Load Limit and Loading Percentage Values.- 6.7 Interlinking Order Control with Manufacturing Control.- 6.8 Effects of the Load Lim §04§it and Time Limit Parameters in Simulation and in Practice.- 6.9 Controller Analogy of Load-Oriented Order Release.- 6.10 Priority Rules and Order Sequencing in Load-Oriented Order Release.- 6.11 References.- 7 Schedule-Oriented Capacity Planning and Control.- 7.1 Abstract.- 7.2 The Problem and the Method.- 7.3 Defining the Load Centers.- 7.4 Schedule-Oriented Capacity Planning Procedure.- 7.5 References.- 8 Implementation of Load-Oriented Manufacturing Control.- 8.1 Abstract.- 8.2 Prerequisites.- 8.3 Program Modules of Load-Oriented Manufacturing Control.- 8.4 System-to-User Interfaces and Hardware Configuration.- 8.5 Implementation Strategies.- 8.6 Load-Oriented Manufacturing Control in Automated Production Sites.- 8.7 Effects of Load-Oriented Manufacturing Control.- 8.8 References.- 9 Comparison of Load-Oriented Manufacturing Control with Other Methods.- 9.1 Abstract.- 9.2 Overview.- 9.3 The Kanban Principle.- 9.4 The Job-Progress Number System.- 9.5 Finite Control with a Graph §04§ic Control Unit (Electronic Leitstand).- 9.6 Queueing Models.- 9.7 The OPT System.- 9.8 References.- 10 Summary.- Appendix A.- Appendix B.

Available to Order

Usually dispatches within 3-4 weeks

While every attempt has been made to ensure stock availability, occasionally we may run out of stock at our stores.

จัดส่งฟรีในประเทศสำหรับยอดสั่งซื้อมากกว่า 1,200.00THB

Discount is applied at checkout.

Recently Viewed Items

Related Products